Hybrid /Electric Waste Vehicle incorporating Robotics
1.Hybrid electric vehicle
2 runs off Syngas from Waste to energy plants for up to 40% less
3 Belly Dump
4 Carries up to 30% greater volune
5 Robotic arm with vision (Programmed)
6 4 wheel steer twin steer on larger models
7Drive by wire
8 Safety beam around robot working area.
9 Takes less than one minute to eject the load.
10 Designed to operate with the latest WTE waste to energy plants.
World First Technology ,looking for manufacturers or JV partners , each WTE Plant has 2-400 trucks These present day vehicles will all be obsolete when this reaches the market'
Manufacturing cost could be up to 50% less than present vehicles.
An animation of the process can be seen at http://hybridwastetruck.webs.com/
You will need to have Adobe Flash Player installed in order to see the animation.
Attached files:24576-Truck.pdfPatents:AU 2,011,000,916
Type of Offer:
Sale or Licensing
« More Waste Management Patents