Problem Solver

Manilal [Alias Mahendra] Chadotaria

Areas Manilal [Alias Mahendra] Chadotaria is Knowledgeable in:

Productivity Improvement,
Mechanical Assemblies,
Break downs
Quality Assurance
Making ISO 9001:2008 Quality Management System walking & Talking
Documentation for ISO 9001:2008 QMS

Techniques Manilal [Alias Mahendra] Chadotaria Uses:

Root Cause Analysis, Toyota's "5 Whys", Fish Bone Diagram, PICKS

Manilal [Alias Mahendra] Chadotaria's Problem Solving Skills:

  1. Long happy life: Balancing of mind and matter through 'VIPASSANA MEDITATION'.
  2. Personality improement: Phychosometic testing, counseling and follow up
  3. Enhancing Customer Satisfaction: ISO 9001:2008 QMS

Manilal [Alias Mahendra] Chadotaria's Problem Solving Experience:

  1. Problem 3:
    Manufacturing of precision Worm Gear Boxes in small batch quantity at economical price through vendor?


    I designed and developed worm cutting hob through vendor and trained operators to accurately manufacture worm shaft and worm gear.
  2. Problem 4:
    I intuitively and firmly decided to live balanced life without medicines but practicing something else available in nature when I suffered heart attack first time in year 2000.

    Specific solution:
    By sheer luck, in next one month, I got exposed to 'Vipassana Meditation', liked it very much and started practicing. In Year 2004, I was forced to undergo a heart bypass surgery by family members, during angiography doctor declared 'no bypass required', natural bypass has occurred.

    Thanks to Vipassana Meditation being practiced since year 2000.
  3. Problem 1:
    Manufacture a batch of 50 drive shafts having multiple accurate groves in short time?

    Specific solution:
    Designed and developed in m/c shop a multiple edge groove tool for lathe machine.
  4. Problem 2:
    Drive shaft end, of a high speed cotton roll forming machine in a continuously running blow room plant, breaking frequently in a week?

    Specific solution:
    Observed that specific event on site while standing near machine for 30 hours, analyzed the problem, taken few trials at manufacturing plant while simulating the actual working condition and caught the root cause, the fault was wrong assembly of a shear pin [Safety Pin]. Trained Assembly Supervisor and Fitter to do a right Job.

    Earned high appreciation from Tech. Director.